
Curtains! Except I only got one because that's all they had so I'm going to have to go back and get another one. I was going to do a valance but I though the tie-up ones would be better, that way I can close them if I want.

And one of the four canvas boxes I need for the closet organizing we want to do.

So here's what we have left to buy:
Blinds (2)
Canvas Boxes (3)
Bead boarding
Base boards
Paint (and I still need to pick a color)
Ceiling fan
Closet door
Bedroom door (maybe, if there's still $ in the budget)
So that's what we have to buy. Aside from installing/doing all that stuff we also have to rip up the carpet and clean the hardwood.
Ya, we have a lot to do. Too bad we're still waiting on the guy to tape and texture.
27w5d
1 comment:
Awesome! Don't stress too much, I actually didn't even really use El's room that much during the first few months. Besides the changing table.
Post a Comment